Ravensdown Geraldine

Ravensdown Geraldine (18)

New Lime Rock Storage

A smart move by Ravensdown has resulted in their new lime rock storage facility reducing the site's annual greenhouse gas emissions by 60%. Keeping the lime protected from the weather prior to processing means they don’t need to use the unsustainable method of drying it with coal. This SmartShelter in Geraldine, Canterbury, is 30m wide and 30m long with a silver fabric cover and mounted to double stack containers on either side.

Benefits

  • Cost less than a conventional build
  • No plant operator needed
  • Reduced annual emissions by 60% = taking 250 cars off the road
  • Annual saving of $100,000
  • Faster processing time
  • Improved product quality 
  • Increased staff morale

Built to Last: Resilient Commercial Shelters with a 12-Year Guarantee

Talk to our team about our highly resilient commercial shelters, backed with a leading 12-year guarantee, and generations of experience. Please get in touch with SmartShalters on 0800 580 297.

Make the Smart Choice by Choosing SmartShelters

Protect what matters with New Zealand-made shelters built on 100 years of trusted expertise. Contact us today!

Ag Q2A2309 adjusted LR